8 Battery Energy Storage System (BESS) Site Requirements
Equipment must be raised a minimum of 1-foot above 100-year water surface elevation (site specific hydrology study required). 5. Integration with the Electrical Infrastructure. Distribution or transmission system level interconnects may require extra real estate for utility infrastructure. 6.