Distributed Photovoltaic Systems Design and Technology Requirements
This study concludes that the maximum PV penetration will be equal to whatever the minimum load is on that specific feeder. That minimum load was assumed to be 25% of the maximum load on the feeder in [13], and if the PV penetration were 25% of the maximum load, only insignificant overvoltages occurred.